Tuesday, May 28, 2019

Galva, KS: Grain Elevator with recent expansion and UP loop track

(Satellite)

Bob Summers posted three photos with the comment: "Another facility capable of loading 100+ hopper cars in central Kansas. This one is on the UP about 15 miles east of McPherson between Canton & Galva."
Dennis DeBruler It looks like there is a lot of ground storage in that first photo.

1

2

3

Dennis DeBruler commented on Bob's post
The jump form bins have been built in the last few years because they don't show on the satellite image.
https://www.google.com/.../data=!3m1!1e3!4m5!3m4...
Bob Summers Looks like construction equipment on site and no railroad tracks so I believe this image was made during the initial build was nearing completion.

Dennis DeBruler commented on Bob's post
You've taught me to look for gaps between the bins to confirm jump form construction.
https://www.google.com/.../data=!3m6!1e1!3m4...

Garry Bley, Oct 2016

Update: the current (captured Dec 2019) satellite image shows the construction has finished and the ground piles are being loaded.
Satellite

Bob Summers commented on his post
My original post last may featured the jump form annex to this train loading elevator on the UP between Canton & Galva Kansas. This view shows the original slip form structure, built less than 20 years ago I think.
Rich Reed So a brand new elrvator custom designed for unit trains hmm.
Bob Summers Exactly Rich Reed With the exception of a few old terminal elevator facilities that are located in grain producing areas, and capable of handling a very large number of inbound truckloads, and also capable of loading unit trains - virtually all of the grain train loading facilities are new facilities!


No comments:

Post a Comment